ENGINEERING CM Power

Construction Management for Chungnam Area (Dangjin Thermal Power Plant-Sinsongsan 1st) Power Cable Tunnel Construction

ClientKorea Electric Power Corp.

Year2024 - 2027

LocationChungnam, Korea

Scale Size : 345kV Transmission Line(6Circuits)

Total Length : L = 3,443m
- Shield TBM : L = 3,345m
- NATM : L = 29m
- Box Culvert : L = 69m

  1. #Grid
  2. #Chungnam
  3. #Domestic