List
List
ENGINEERING
Water
Sewerage
Preliminary and Detailed Design for the Buffer Storage and Non-Point Source Pollution Reduction Facilities in the Daegu National Industrial Complex Development Project (Phase 2)
ClientKorea Land and Housing Corporation
Year2024 - 2025
LocationDaegu, Korea
Scale
Buffer Storage Facility: Volume = 650m³
Non-Point Source Pollution Reduction Facility: Volume = 15,800m³
Sewage Pipeline: L=1.0 km
The purpose of this task is to establish the basic and detailed designs for the buffer storage and non-point source pollution reduction facilities to be installed in the detention basin of the Daegu National Industrial Complex Development Project (Phase 2).