ENGINEERING
Water
Waterworks
Preliminary and Detailed Design for the Rural Living Water Development Project in the Ungok District
ClientCheongyang County
Year2024 - 2025
LocationCheongyang, Korea
Scale
Distribution Pipe : 62.5km
Water Pipe : 29.2km
Booster Pump : 8areas
The purpose of this task is to establish the basic and detailed designs for the water supply expansion project in Cheongyang-eup, Daechi-myeon, and Ungok-myeon of Cheongyang-gun. This involves collecting and analyzing all necessary data for the design, conducting surveys and geological investigations, and reviewing higher-level and related plans, including the Cheongyang-gun Water Supply Master Plan. The goal is to ensure the stable supply of high-quality water.