ENGINEERING Water Sewerage

Preliminary and Detailed Design for the Renovation of the Sewage Pipeline in the Dobong 2-1 Sub-District

ClientDobong-gu

Year2024 - 2025

LocationSeoul, Korea

Scale Area of Interest: 29 ha
Manhole Inspection: 8.7 km
Route Survey: 3.1 km
Soil Investigation: 3 locations
Flow Measurement: 5 locations
Water Quality Measurement: 2 locations
Odor Investigation: Total of 30 times
Basic and Detailed Design

The goal is to develop improvement measures to enhance the functionality and quality of the sewage pipeline, prepare detailed construction plans and maintenance strategies to realize these improvements, and establish comprehensive drainage improvement measures for areas affected by flooding.

  1. #Domestic
  2. #Sewerage
  3. #Seoul