List
ENGINEERING Water Sewerage

Feasibility Study and Development of Basic Plan for Integrated Biogasification Facility Installation Project in Hwasun County

ClientHwasun County

Year2024 - 2024

LocationHwasun, Korea

Scale Feasibility Study and Basic Plan Development for Integrated Biogas Plant Installation Project in Hwasun County (Sewage Sludge, Livestock Manure, Food Waste)

The objective is to conduct feasibility studies and develop basic plans to install an optimal integrated biogasification facility for the stable treatment of organic waste generated in Hwasun County. This involves analyzing the generation and treatment status of target waste, treatment methods, and site conditions for facility installation. Through this project, the aim is to contribute to the stable treatment of target waste and the creation of a pleasant local environment. Additionally, it aims to provide the groundwork necessary for future implementation of the integrated biogasification facility installation project in Hwasun County.

  1. #Domestic
  2. #Sewerage
  3. #Jeolla-do
List