Detailed Design for Chuncheon Area(Namchuncheon-Chuncheon) Power Cable Tunnel Construction
ClientKorea Electric Power Corp.
Year2023 - 2024
LocationChuncheon, Korea
Scale
Size : 154kV Transmission Line(2Circuits)
154kV Distribution Line(2~4Circuits)
Total Length : L = 6,100m
- Semi Shield : L = 380m
- Pipe Jacking : L = 40m
- Duct : L = 5,680m