List
List
ENGINEERING
Water
Waterworks
Review of Industrial water pipeline in Cheongyang General industrial complex
ClientCheongyang County
Year2023 - 2023
LocationCheongyang, Korea
Scale
Industrial water Pipe : L=11.9km
Emergency link pipe : L=1.8km
Pump Station : 2 Points
The purpose of this design is to establish a master plan for the installation of water supply facilities in line with the occupancy schedule of the currently operating Cheongyang General Industrial Complex. This aims to prevent delays in occupancy and support smooth economic activities within the industrial complex.