ENGINEERING CM Power

Construction Management for BukansanS/S Power Distribution Draw-off 2nd Power Cable Tunnel Construction

ClientKorea Electric Power Corp.

Year2022 - 2024

LocationAnsan, Korea

Scale Total Length : L = 1,238m
- Shield TBM(D=2.6m) : L = 1,109m
- Semi Shield(D=1.5m) : L = 129m