Preliminary and Detailed Design for the Installation Project of Sewerage Systems in Osan and Taebong Rural Villages
ClientChangwon City
Year2022 - 2024
LocationChangwon, Korea
Scale
(1) Rural Village Sewerage Installation Project Basic and Detailed Design:
- Installation of Small-Scale Public Sewage Treatment Facilities: 130㎥/day
- Sewer Pipeline Maintenance (D80~D200mm, L = 4.35km)
- Manhole Pumping Station Installation: 5 facilities
- Drainage Facility Maintenance: 215 households
(2) Site Survey:
- Surveying: Topographic Survey A=2,395㎡, Route Survey L=4.35km
- Drainage Facility Survey: 215 households
This project aims to adequately treat wastewater generated from 179-1, Taebong-ri, Jindong-myeon, Masan-happo-gu, Changwon City. By treating the wastewater appropriately, the project aims to contribute to the improvement of urban living conditions and public hygiene, with the ultimate goal of improving the water quality of Masan Bay.