List
ENGINEERING Water Sewerage

Preliminary and Detailed Design for Yongsan-22 Sogu Subarea Sewer Pipeline Rehabilitation Project

ClientSeoul City

Year2022 - 2024

LocationYongsan, Korea

Scale Overall excavation (circular pipe, BOX) : L=4,747.6 m
Partial excavation (circular pipe) : L=362.5 m
Total repair (circular tube) : L=1,617.6m
New pipeline (circular pipe, BOX) : L=658.0m

The objective of this is to develop improvement measures for enhancing the functionality and quality of sewage pipelines and to formulate detailed construction and maintenance plans to implement these improvements.

  1. #Domestic
  2. #Sewerage
  3. #Seoul
List