Preliminary and Detailed Design for the Water Supply System Adjustment Project in the Southern Region of the Geumgang River (2nd)
ClientKorea Water Resources
Year2021 - 2023
LocationJeollabuk-do, Korea
Scale
Adjustment of the water supply system : 109.2 thousand㎥/day
Establishment of pressurization facilities : 3 locations
Water pipe : 9.4㎞(D=600㎜)
By adjusting the water supply system between regions, we ensure the timely and stable supply of water according to the Saemangeum development plan.