Detailed Design for Nam-gu Sewage Pipeline Maintenance Project [Phase 2]
ClientDaegu Nam-gu
Year2021 - 2023
LocationDaegu, Korea
Scale
Pipeline excavation work : 12.5km
Pipeline non-excavating construction : 1.52km
Partial maintenance of pipeline : 695 sites
Repair of pipeline ceiling : 400m
Based on the results of a detailed sewer pipe survey, an implementation design was carried out for the maintenance of old sewer pipes in Bongdeok 2, 3-dong and Daemyeong 3, 4-dong of Nam-gu.