List
ENGINEERING Water Waterworks

Development of Hwaseong County Water Supply Basic Plan (Revised)

ClientHoengseong Country

Year2021 - 2023

LocationHoengseong, Korea

Scale Target year : 2040
Hoengseong-gun (1 eup, 8 myeon, A=998.07㎢)
Establishment of the Basic Plan for Water Maintenance (Change) : Equation 1

The purpose of this task is to systematically and reasonably establish a revised basic water supply plan for Hwaseong County, which includes responding to changes in higher-level plans, establishing a stable unauthorized water supply system even in emergencies such as earthquakes or disasters, securing water resources to prepare for prolonged droughts, and expanding the regional water supply and drainage system.

  1. #Domestic
  2. #Gangwon-do
  3. #Waterworks
List