List
List
ENGINEERING
Water
Sewerage
Technical Diagnosis of Sewerage Pipeline in the Gulpoh Treatment Area of Songsan, Unbuk, Yeongjong, Incheon
ClientIncheon Metropolitan City
Year2021 - 2022
LocationIncheon, Korea
Scale
Total length of sewer pipes inspected : 29.1km
CCTV inspection of sewer pipe interiors : 29.1km
Smoke (fume) inspection : 41.3km
Flow and water quality inspections conducted at 20 locations
There are 9 sewage pumping stations.
By conducting a technical diagnosis of sewer pipelines, we diagnose the current condition and identify issues, allowing us to devise improvement measures. This ensures stable sewage transportation, preserving river ecosystems, and enabling efficient operation of sewage treatment facilities.