List
List
ENGINEERING
Water
Waterworks
Osan County Water Maintenance Basic Plan (Change) and Detailed Design for busan Drainage of Construction
ClientOsan-si
Year2021 - 2024
LocationOsan, Korea
Scale
Water Resource Management Plan
Drainage : V=7,000㎥
pressurized field : Q=13,200㎥
According to the development demand of the planned urbanization area of Busan-dong, Osan-si, the basic plan for water maintenance (partial change) in Osan-si is established, and the Busan drainage is built to supply tap water to residents in Busan-dong.