List
ENGINEERING Water Sewerage

Preliminary and Detailed Design for Maintenance Project of Decrepit Sewer Pipelines in the Jik-dong area

ClientPocheon-si

Year2021 - 2023

LocationPocheon, Korea

Scale Sewage Pipeline = 17.7km
Manhole inspection: 9 locations
Sewer latera: 519 households

The purpose of this project is to contribute to the sound development and public hygiene improvement of the city by preventing water pollution in the discharged river by introducing sewage generated in the direct-dong treatment area (i.e., direct-dong) due to the expansion of the treatment area into the car collection pipe.

  1. #Domestic
  2. #Gyeonggi-do
  3. #Sewerage
List