ENGINEERING Power Transmission Grid

Detailed Design for Gangwon Area Power Cable Tunnel Construction

ClientKorea Electric Power Corp.

Year2020 - 2023

LocationJeongseon, Korea

Scale Size : 500kV 2Bi-Pole (4~8Circuits)
Total Length : L = 4,004m
- Shield TBM(Ø=3.0m) : L = 3,967m
- NATM(Ø=3.0m) : L = 20m
- Box Culvert : L = 17m

This project involved the basic and detailed design of the underground power line construction to cross the ecological landscape conservation area, specifically the Donggang section, as part of the 500kV East Coast to Singapyong construction project.