List
ENGINEERING Power Electrical

Preliminary and Detailed Design for Maintenance of Sewage Pipelines Around Gusan

ClientChangwon City

Year2020 - 2022

LocationChangwon, Korea

Scale Sewer : 35.6km
Drainage equipment : 1,500ea

Facility scale:
-Manhole Pumping Station
-380V/220V low receiving voltage

The purpose is to adequately treat wastewater in the area of Gusansan-myeon, Masanhapoho-gu, Changwon City, contributing to the improvement of urban outskirts living conditions and public hygiene. Additionally, it aims to enhance the water quality of Masan Bay.

  1. #Domestic
  2. #Sewerage
  3. #Gyeongsang-do
  4. #Electrical
List