List
List
ENGINEERING
EIA
Post-EIA
Post-Environmental Impact Survey for Incheon Metro Line 1 construction of Geomdan Extension Line (at the time of construction)
ClientIncheon Metropolitan City
Year2020 - 2025
LocationIncheon, Korea
Scale Length: 6.825km
An environmental impact assessment was conducted for the railway project connecting the north and south regions of Incheon Metropolitan City. The purpose of this project is to establish a low-carbon green transportation infrastructure to improve regional transportation, enhance the convenience of citizens' transportation, and boost the competitiveness of the Geomdan New City.