List
List
ENGINEERING
Water
Sewerage
Preliminary and Detailed Design for Maintenance of Sewage Pipelines in Yulchon and One Other District
ClientGochang County
Year2020 - 2021
LocationGochang, Korea
Scale
Sewer Pipe : 20.0㎞
Households : 362 houses
Pump Station : 13 Points
The purpose is to prevent water pollution in discharge areas, improve urban aesthetics, and contribute to the health of the residents by treating wastewater generated in the Daesan treatment area and Haeri small-scale treatment area of Gochang County through the construction of new sewer pipelines.