List
ENGINEERING Water Sewerage

Preliminary and Detailed Design for Maintenance of Sewage Pipelines in Yulchon and One Other District

ClientGochang County

Year2020 - 2021

LocationGochang, Korea

Scale Sewer Pipe : 20.0㎞
Households : 362 houses
Pump Station : 13 Points

The purpose is to prevent water pollution in discharge areas, improve urban aesthetics, and contribute to the health of the residents by treating wastewater generated in the Daesan treatment area and Haeri small-scale treatment area of Gochang County through the construction of new sewer pipelines.

  1. #Sewerage
  2. #Jeolla-do
  3. #Domestic
List