ENGINEERING
Water
Sewerage
Preliminary and Detailed Design for Construction of Sewer System in Sinmae-ri and Reduction of Pollution Load of Overflow of Combined Sewer System in Okcheon-gun
ClientOkcheon County
Year2012 - 2013
LocationOkcheon, Korea
Scale
1) Preliminary and Detailed Design for Construction of Sewer System in
Sinmae-ri Capacity of WWTP : 60㎥/day
Pipe : 7.3㎞(D200 : 7㎞, D300:0.3㎞)
House Connection : 103 Households / Pumping Station : 4 points
2) Reduction of Pollution Load of Overflow of Combined Sewer System in
Okcheon-Province Reservoir : 15,000㎥
Storm Overflow Chamber : 46EA
Pipe : D600×95m, D300×149m