List
ENGINEERING Water Waterworks

Preliminary and Detailed Design for Water Supply System in Jeokryang, Choicheon and Gojeon

ClientHadong County

Year2017 - 2018

LocationHadong, Korea

Scale Route survey: 83.1km
Distribution pipeline: 83.1km
Pressure device: 10 stations

The objective is to consider the challenging situation in which the water usage in the areas of Jeokryang, Heokcheon, and Gojeon in Hadong County is high, making it difficult to provide a stable water supply with limited groundwater and stream water sources. Therefore, the goal is to supply abundant and clean water continuously by providing a local water supply system with good water quality and quantity. This aims to enhance the quality of life for residents.

  1. #Domestic
  2. #Waterworks
  3. #Gyeongsang-do
List