List
ENGINEERING CM Highway / Airport

Constuction Management for Seoul~Jemulpo Tunnel Private Investment Construction

ClientSeoul Tunnel Inc.

Year2015 - 2021

LocationSeoul, Korea

Scale 4lines Tunnel(Return lane), L=3.25㎞(for Small Vehicle),
Tunnel(2lines) 2,923m(arrange in a row)
Tunnel(1line) 482m(arrange in a row)
Underground(2lines) 694m(2places)
Underground(1line) 550m(2places)
Vantilation 1place
Discharge gate 2places

  1. #Highway
  2. #Tunnel
  3. #UndergroundRoad
  4. #Domestic
List