ENGINEERING CM Power

Construction Management for Sinbuyeong#2-Yeongseo 1,2 Area Power Cable Tunnel Construction

ClientKorea Electric Power Corp.

Year2015 - 2024

LocationIncheon, Korea

Scale Size : 345kVTransmission Line(3Circuits)
Total Length : L =10,628m
- Shield TBM(Ø=3.0m) : L = 10,256m
- NATM(B 2.7m x H 2.8m) : L = 50m
- Messer Shield(B 2.4m x H 2.1m) : L = 54m
- Box Culvert(B 2.5m x H 2.3m) : L = 268m