List
ENGINEERING Transport Geotechnical / Tunnel

Detailed Design for Dongbu Expressway Wideness(The 2nd Section) of Underpass Construction

ClientSeoul Metropolitan Infrastructure Headquarters

Year2015 - 2016

LocationSeoul, Korea

Scale Length=3.52km, Width=3~6 Lanes, Underpass 1 nos./1.29km(BOX 1,090m+U-TYPE 200m)

This project involves the expansion and undergrounding of the Eastern Inner Loop Road to ensure smooth traffic flow, prevent accidents, and promote balanced national development. Detailed design work has been carried out for the second phase of this project.

  1. #Seoul
  2. #Geotechnical
  3. #Road
  4. #Underpass
  5. #Domestic
List