List
List
ENGINEERING
CM
Waterworks / Sewerage
Constuction Management for Rainwater Storage Facility in Naedong District
ClientChangwon-City
Year2014 - 2015
LocationChangwon, Korea
Scale
Water storage V=36,000㎥(80m×90m×5m)
Inlet pipeline : L=948m,
Subsurface Drainage Pump 1ea
Water Supply and Drainage Pipe 1ea(L=469m),
Gate Pump 1ea
Utilization and Waste treatment facility 1ea