List
List
ENGINEERING
CM
Railway
Construction Management for District 16 and District 17 for Pohang~Samcheok Railway
ClientKorea Railway Network Authority
Year2014 - 2024
LocationSamcheok, Korea
Scale L=26.63㎞, Earth Work 7.92㎞, Bridge 2.47㎞, Tunnel 16.24㎞
Management of the construction project of roadbed construction work for sections 16 and 17 of the Pohang-Samcheok section of the Donghae Line to establish a pan-East coastal axis and a national railway network through balanced development of the country, sharing of tourism demand in the Gangneung-Taebaek area and Gyeongbuk area, and linkage with the southeastern area and the east coast area. It was carried out.