ENGINEERING
Power
Electrical
Preliminary and Detailed Design for Redundant System of Underground Transmission Line in Sihwa Tidal Power Station
ClientKorea Water Resources Co.
Year2014 - 2015
LocationAnsan, Korea
Scale
Facility scale:
-154kV underground transmission line
XLPE 1,200m㎡ ICX 3line: 9.59km
Length : 1.8㎞, River Crossing : 2EA, Road Crossing : 3EA, Manhole : 5EA
In conjunction with design of 2 sections of a 154kV underground transmission line for the Sihwa tidal Power Plant, design for the undergrounding of 1 circuit transmission line for a newly established 1,800km section to the nearby MTV substation.