List
List
ENGINEERING
Water
Sewerage
Preliminary design for waste water treatment plant of Godeok industrial complex(phase 1)
ClientDaelim Industrial Co., Ltd
Year2013 - 2013
LocationPyeongtaek, Korea
Scale
WWTP Q= 102,000㎥/day
Reuse facility : 1,020㎥/day
The plan involves installing a wastewater treatment facility with a total capacity of 340,000㎥/day in the General Industrial Complex of the Godeok International Plan Zone to ensure that the wastewater discharged meets legal discharge water quality standards. This includes the first phase with a capacity of 102,000㎥/day. In accordance with reuse-related laws, a reuse facility (1,020㎥/day) has been installed, which adheres to the legal standard of 10%.