List
ENGINEERING Transport Geotechnical / Tunnel

Preliminary and Detailed Design for Jungang Railway Section 1

ClientKorea Railway Network Authority

Year2012 - 2014

LocationDanyang, Yeongam, Korea

Scale Earthwork 6.2㎞, Bridge 2.3㎞(13place), Tunnel 2.0㎞(6place), Station(1place)
Slope Stability

The double-track railway project connecting Dodam to Yeongcheon is an undertaking aimed at addressing the increased rail traffic volume, alleviating the capacity shortage on the railway line, and reducing travel time. The project involved performing basic and detailed design work for the first section of the project.

  1. #Domestic
  2. #Chungcheong-do
  3. #Jeolla-do
  4. #Railway
  5. #Geotechnical/Tunnel
List