List
ENGINEERING CM Railway

Construction Management for the Railway bridge Rehabilitation Project in Sinamchun

ClientKorea Railroad

Year2011 - 2015

LocationNonsan, Korea

Scale Length : L=1.085㎞, Retaining Wall 740m,
Bridge Renovation (2@4.0*2.0 => 2@10.0*4.0)

  1. #Railway
  2. #Domestic
  3. #Chungcheong-do
List