List
List
ENGINEERING
Transport
Highway / Airport
Feasibility Study and Master Plan for approach ramp Improvement to Hangang bridge
ClientSeoul Metropolitan Government
Year2012 - 2013
LocationSeoul, Korea
Scale Interchange(Grade separating type) 4 section, bridge 2339m/8ea, underpass 439m/2ea, Ramp design speed : 40㎞/hr
This project route is a feasibility study and a basic plan to resolve traffic congestion between the two Koreas by improving the connection lamp structure of the bridge crossing the Han River