List
List
ENGINEERING
Transport
Geotechnical / Tunnel
Feasibility Study and Master Plan for Construction of Electrical Single Rail Test Track
ClientMinistry of Land Transport and Maritime Affairs
Year2011 - 2012
LocationSejong, Korea
Scale
Earthwork 4.1㎞, Bridge 1.5㎞(6place), Tunnel 5.8㎞(6place)
Length: 14.7km
Site Investigation : Boring 14