Preliminary & Detailed Design for Seohae Railway Section 8

ClientKorea Railway Network Authority

Year2012 - 2012

LocationHongseong, Korea

Scale Earthwork 3.1㎞, Bridge 2.3㎞(5place), Tunnel 3.1㎞(2place)
Foundation Design : 6 Bridges

The West Sea Line Railway Project, connecting Hongseong to Song-san, is a project aimed at addressing the railway line's capacity shortage due to a significant increase in freight traffic and reducing travel times. Detailed preliminary and detailed design work has been carried out for the eighth phase of this project.