List
List
ENGINEERING
CM
Power
Detailed Design for Guri-Namyangju Area (Hwayang #2, Mikwang T/L Undergroundwork) Power Cable Tunnel Construction
ClientKorea Electric Power Corp.
Year2010 - 2013
LocationNamyangju, Korea
Scale
Size : 154kV Transmission Line(2Circuits)
Total Length : L = 593.13m
- Semi Shield(Ø=2.4m) : L = 344.8m
- Messer Shield(B 1.7m x H 2.15m) : L = 81.57m
- Box Culvert(B 1.7m x H 2.15m) : L = 143.76m
- Cable Head : 1ea