List
List
ENGINEERING
Power
Electrical
Preliminary and Detailed Design for Community Wastewater Treatment Facilities in Bodeok, Yucheon 2-ri, Yeongi-gun
ClientYeonggi County
Year2009 - 2011
LocationSejong, Korea
Scale
3 of WWTPs(105㎥/day, 30㎥/day, 30㎥/day)
Sewer Pipe : 17.5㎞
Facility scale:
-Community Sewage Facility
-380V/220V low receiving voltage
Three small-scale sewage systems with daily capacities of 105 cubic meters, 30 cubic meters, and 30 cubic meters were installed to collect wastewater discharged from Bodeok 1, 2-ri and Yucheon 2-ri in Jeondong-myeon. Additionally, by addressing untreated wastewater areas, improvements were made to reduce water quality pollution in the discharge area.