List
List
ENGINEERING
Water
Sewerage
Preliminary and Detailed Design for Namyang and Bibong Domestic Water Supply Development in Agriculture Area
ClientCheongyang County
Year- 2009
LocationHwaseong, Korea
Scale
Transmission Pipe : L=100㎞
ø=200~50mm
The purpose of this project, located in the Namyang area of Cheongyang County, is to provide domestic and other water supplies. Due to the expansion of the water supply area, there is an increasing demand for water. Therefore, the project aims to establish an efficient and cost-effective facility plan to ensure stable supply of high-quality metropolitan water to both existing makeshift water supply areas and unsupplied areas. The goal is to effectively address future water supply demands.