List
ENGINEERING Transport Geotechnical / Tunnel

Preliminary & Detailed Design for National Road(No.23) & Access Road to Expressway (Jungri-Bongmyeong)

ClientLH (Korea Land Housing Corporation)

Year2010 - 2024

LocationYongin, Korea

Scale Length : 10.8㎞, Width : 20.0m(4 lanes), Bridge : 17nr/1,766.4m,
Underpass : 2nr/1,114m, Tunnel : 2nr/1,230m

This project involves the establishment of a new interchange (IC) from Jungri to Bongbyeong to ensure smooth traffic flow and reduce travel time. A feasibility study and design work have been carried out for this project.

Conducting research and design services for the establishment and expansion of National Map Line 23 for the smooth implementation of measures to improve wide-area transportation for the Dongtan (2) new city housing site development project in Hwaseong.

  1. #Domestic
  2. #Gyeonggi-do
  3. #Highway
  4. #Geotechnical
List