List
ENGINEERING Water Sewerage

Technical Diagnosis for the 2025 Gapyeong-gun Sewer Pipeline (Samhoe Treatment Area and 7 Other Sites)

ClientGapyeong County

Year2025 - 2025

LocationGapyeong, Korea

Scale Sewer Pipelines (47 km)
Current status investigation: Basic data collection & analysis, field investigation
Condition assessment: Equipment, machinery & piping, electrical/instrumentation systems, flow, water quality, CCTV survey in sample areas
Facility improvement and efficiency measures
Countermeasure diagnosis: Identify issues, establish improvement and maintenance plans
Preparation of final report (including preliminary cost estimate)

This technical diagnosis is conducted in accordance with Article 20 (Technical Diagnosis, etc.) of the Sewerage Act, Article 14 (Contents and Subjects of Technical Diagnosis, etc.) of the Enforcement Rules of the same Act, and the Regulations on Technical Diagnosis of Public Sewerage. Its purpose is to ensure the efficient operation of the county’s sewer pipelines by presenting measures such as collection of basic data, flow and water quality surveys, condition assessments of facilities and operations, diagnosis of pipeline connectivity, identification of facility issues and improvement plans, and maintenance and management strategies.

  1. #Sewerage
  2. #Gapyeong
  3. #Domestic
List