Preliminary and Detailed Design for the Rural Community Water Supply Development Project in Gisan District

ClientJangheung County

Year2025 - 2026

LocationJangheung, Korea

Scale 1. Basic Survey
- Collection and analysis of basic data
- Review of related plans
2. Field Survey
- Surveying: water supply pipeline survey (10.1 km), topographic survey (570 ㎡)
- Geological survey: 5 boreholes (NX), various tests (lump sum)
3. Basic and Detailed Design
- Distribution pipelines: L = 10.1 km
- Construction of new booster pumping stations: 2 sites
- Ancillary facilities: architecture, mechanical, electrical, instrumentation & control, etc.
4. Preparation of Permit/Approval Documents (lump sum)
- Water supply project approval
- Other permit/approval documents
5. Design Safety Review (lump sum)

Due to natural disasters caused by climate change, such as floods and droughts from global warming, and incidents such as water supply interruptions resulting from the deterioration of water supply facilities, there is an increasing threat to safe water supply. Furthermore, the frequent occurrence of both human-induced and natural water quality accidents has heightened this risk. Accordingly, it is necessary to establish stabilized water supply facilities to respond to such challenges, with the aim of building emergency water supply facilities that can ensure a stable environment for water supply.