Consultancy Services for Grid Reinforcement Project in Sihanoukville, Cambodia
ClientEDC(ELECTRICITE DU CAMBODGE)
Year2024 - 2029
LocationSihanoukville, Cambodia
Scale Construction of 230kV, 115kV substations (New : 4, expansion : 2) / 115kV transmission line (overhead: 19.7 km, underground: 2.3 km)
This project is in line with Cambodia's industrial development policy and fundament energy plan, which to supply high-quality and stable electricity by enabling connection to the national grid network instead of off-grid and self-generation supply within Sihanoukville area.
The construction of 4 new substations and the expansion of 2 existing substations will provide reliable power services and distribute the power currently concentrated at the SHV1 substation, ensuring a stable power supply. This will address issues such as voltage drop, overload of the existing transmission line, and power supply challenges based on load demand forecasting.