List
List
ENGINEERING
Transport
Highway / Airport
Construction Management (Design Stage) and Design V.E (Value Engineering) for Gigye~Andong 1 Besides 8 project
ClientMinistry of Construction & Transportation busan Office
Year2011 - 2021
LocationPohang, Korea
Scale Length(L)=80㎞, Width(B)=4~6 lane, Bridge 60Place / Tunnel 9Place
This project route is a construction project management service for 8 basic and implementation designs, including machinery and Andong 1, ordered by the Busan Metropolitan Government to review design books for internalization of design books and conduct design VE to improve the economic feasibility of each project