List
ENGINEERING Transport Highway / Airport

Construction Management (Design Stage) and Design V.E (Value Engineering) for Gigye~Andong 1 Besides 8 project

ClientMinistry of Construction & Transportation busan Office

Year2011 - 2021

LocationPohang, Korea

Scale Length(L)=80㎞, Width(B)=4~6 lane, Bridge 60Place / Tunnel 9Place

This project route is a construction project management service for 8 basic and implementation designs, including machinery and Andong 1, ordered by the Busan Metropolitan Government to review design books for internalization of design books and conduct design VE to improve the economic feasibility of each project

  1. #Domestic
  2. #Gyeonsang-do
  3. #Road
List