Construction Management for District 1 for sinlim line light railway
ClientUrban infrastructure headquarters. Seoul
Year2016 - 2022
LocationSeoul, Korea
Scale Length : 2,249m, Station 3place, Ventlating Opening 1place
The overall responsibility and supervision of the first section of the Sillim Line light rail construction project was carried out from 2011 to 2022 to provide subway and rail transportation services to the southwestern part of Seoul, an area that did not benefit from existing subway and railroad services. Through this project, the intention was to establish public transportation infrastructure and establish an eco-friendly public transportation system by establishing a network with existing urban railways.