List
List
ENGINEERING
CM
Power
Construction Management for Suwon, Mangpo Area(Mangpodong Undergroundwork) Power Cable Tunnel Construction
ClientKorea Electric Power Corp.
Year2013 - 2014
LocationSuwon, Korea
Scale
Size : 154kV Transmission Line(8Circuits)
Total Length : L = 275.60m
- Messer Shield(B 2.2m x H 2.25m) : L = 238.24m
- Box Culvert(B 2.2m x H 2.25m) : L = 37.36m