ENGINEERING
Energy
ESS
Design and Construction Management for the Solar Power Plant and Connected ESS in Saemangeum Hatbitnuri
ClientHanwha Energy
Year2017 - 2017
LocationGunsan, Korea
Scale
Site Area: 680㎡
Capacity: Energy Storage System(ESS) 19MWh
This project is designed as a distributed power system that stores the electricity generated by solar power generation in an Energy Storage System (ESS) and supplies it to the KEPCO grid. By supplying the electricity generated during surplus hours to the KEPCO grid, it contributes to stabilizing power supply and demand.