Detailed Design and Specification for Paldang No.2 Intake Station Power Substation Improving and Repairing
ClientKorea Water Corp.
Year2012 -
LocationHanam, Korea
Scale
Facility scale:
-Outdoor 170kV GIS 1200A 50kA
-154kV MTR 20/25MVA x2
-Indoor electrical faucet panel(154kv) Installation
-6.6kV Cable and Cable Tray
-Electir Power Comprehensive Management System Installation
-Demolition of an outdoor 154kV steel ball substation
-New incoming steel tower (34m-1 line) and demolition of existing steel tower