List
ENGINEERING Transport Geotechnical / Tunnel

Detailed Design for Bosung~Imsungri Railway Section 4

ClientKorea Railway Network Authority

Year2012 - 2015

LocationGangjin, Korea

Scale Site Investigation : Boring 22, other tests,
Foundation Design : 5 Bridges & Culverts

The railway construction project connecting Boseong to Imsung-ri is aimed at addressing the railway line's capacity shortage due to a significant increase in freight traffic and reducing travel times. Detailed preliminary and supplementary detailed design work has been carried out for the fourth phase of this project.

  1. #Railway
  2. #Geotechnical
  3. #Domestic
  4. #Jeolla-do
List