List
ENGINEERING Power Transmission Grid

Detailed Design for Changwon-Gangseo Area(Shinhang branch) Power Cable Tunnel Construction

ClientKorea Electric Power Corp.

Year2023 - 2025

LocationChangwon, Busan, Korea

Scale Size : 154kV Transmission Line(4Circuits)
Total Length : L = 6,533.71m
- Duct : L = 4,459.5m
- Shield TBM(ø=2.6m) : L = 1,900m
- FM Method Pipeline : L = 80m
- FM Method Pipeline(DTH) : L = 85.5m
- Box Culvert : L = 10.1m

  1. #Grid
  2. #Gyeonsang-do
  3. #Domestic
List