List
List
ENGINEERING
Transport
Geotechnical / Tunnel
Detailed Design for Dongbu Expressway Wideness(The 2nd Section) of Underpass Construction
ClientSeoul Metropolitan Infrastructure Headquarters
Year2015 - 2016
LocationSeoul, Korea
Scale Length=3.52km, Width=3~6 Lanes, Underpass 1 nos./1.29km(BOX 1,090m+U-TYPE 200m)
This project involves the expansion and undergrounding of the Eastern Inner Loop Road to ensure smooth traffic flow, prevent accidents, and promote balanced national development. Detailed design work has been carried out for the second phase of this project.