List
List
ENGINEERING
Power
Transmission Grid
Detailed Design for Gangwon Area Power Cable Tunnel Construction
ClientKorea Electric Power Corp.
Year2020 - 2023
LocationJeongseon, Korea
Scale
Size : 500kV 2Bi-Pole (4~8Circuits)
Total Length : L = 4,004m
- Shield TBM(Ø=3.0m) : L = 3,967m
- NATM(Ø=3.0m) : L = 20m
- Box Culvert : L = 17m
This project involved the basic and detailed design of the underground power line construction to cross the ecological landscape conservation area, specifically the Donggang section, as part of the 500kV East Coast to Singapyong construction project.